Updates & Improvements
House Improvements
House lifted with proper posts and footers installed.
Chimney lifted: $6,290.00
New septic system: 500-gallon metal tank replaced with 100-gallon cement tank, enclosed pump system: $18,000
Full HC Hafford Dry Basement system: $6,188.00
Full house water filtration system: $2,700.00
Anderson Windows for all structures: $30,807.00
New deck facing the lake: $5,000.00
Custom design red cedar privacy fence: $6,000.00
White cedar fence (150 ft): $3,000.00
Generator on cement pad with two owned tanks: $7,422.00
Additional oil tank with cement pad relocation: $2,500.00
Replaced approximately 90% new copper pipes: $10,803.00
Upgraded electrical panels (house & garage): $8,120.29
Guest Quarters (Detached Garage)
Added guest quarters with new chimney, wood stove, electric heat: $24,000
Additional bath in guest quarters: $15,000
Garage floor and additional deck repairs: $4,800.00
Living Space Improvements
Chimney inspection, cleaning, new liner, and cap installed.
Replaced dangerous wood stove with used Vermont Castings stove: $3,500.00
Interior painting (8 coats): $4,189.00
Bedroom 1 wall restoration (6 coats): $1,800.00
Bedroom 2 wall restoration (6 coats): $1,800.00
Bathroom Improvements
Full new bathroom added (construction to finish): $28,000
Primary bedroom and bath updates: $12,000
Bunkhouse Improvements
New metal roof: $950.00
Updated circuit breaker box and electrical inspection: $900.00
Interior painting: $500.00
Total for bunkhouse: $2,350.00
Exterior Improvements
New porch decking, floors, and pillars: $10,000
Fire pit: $475.00
Wood ramp for lake access: $1,200.00
Landscape design and installation (ongoing): $50,000 - $75,000
Added stone patio and stone wall: $3,500.00
Exterior painting (house, bunkhouse, garage): $15,000.00
Interior painting (house & guest room): $7,000.00
Roof Replacements
House: $12,485.00
Detached garage: $3,685.00
Total for roof replacements: $16,170.00
Dock and Water Access
New Shore Master Dock System: $8,536.00
Floating swim float: $889.00
Total for dock system: $9,425.00
Total Cost of Improvements:
$322,745.29